Projects
Black Power
Bulawayo District
As it is they have no well. We get water from a stream canal from Bata shoes industry waste water used for cleaning leather. It is dirt water and since their most recent drought, they will suffer to get sufficient water for their garden and animals.
Emhlane
Eswatini District
The project started in August 2018 by a group of single parent mothers as a way of generating income to boost their economic status. Apart from vegetable production, the project also has indigenous chicken production.
Luveve
Bulawayo District
(INSERT MORE INFORMATION FOR THE PROJECT)
Objectives for the Luveve Bulawayo District Project:
The aims and objectives of ISIBI SABOMTHWAKAZI shall be:
1. To mobilize resources for the Matabeleland Region and Country in order to create employment, alleviate poverty and control diseases.
2. To raise cultural awareness amongst the people of Matabeleland.
3. To empower the people of Matabeleland socially, economically and politically within the context of their culture.
Mahangule
Tsholotsho District
Mahangule needs a well for two villages to drink from. They are currently drinking water from the dam.
Mlmotsho School Project
Esigondini District
Mlmotsho school garden has been running since 2015. They have one well and need it converted from manual to solar powered in order to sustain all of the people and crops it is used for.
Nkwidze
Gwanda North
This area is in desperate need of a well as it is drought prone. Conditions look suitable for underground water to be available once the well is drilled. There are many opportunities for marketing produce once crops and animals are a sustainable resource here.
Sizalobuhle
Nkayi District
150 villagers in need of fresh drinking water and to develop their gardens to prepare for crops.